Installation of Span Module Steel Arch Bridge 3300Ton by barge and SPMT (December, 2011)

Total implementation time of 7 days, the steel arch bridge weighing more than 3,300 tons with height of 33m, width of 30m and length of 153m

Using barge of 12,000 tons.

The loadout was carried out by the VTT team using SPMT. Meanwhile, the installation of the bridge arch onto the pier shall taking advantage of the tides, combined with the pumping of water into/out the barge and the lifting and lowering capacity of the SPMT