BLIKPAPAN - INDONESIA PROJECT (March 2021)

On March 26th, Vietranstimex completed load-out of two Oil and Gas structures for Blikpapan - Indonesia project at Chua Ve Port, Hai Phong. These are the two oversized-overweighed structures of the Project including:

- the Radian weighing 212 tons, measuring 13.86m x 11.12m x 18.88m; and

- the Convection Module weighing 99.3 tons, measuring 17.64m x 4.28m x 6.05m (length x width x height)

which have been loaded-out by young generation engineers of VTT in both the South and the North branches. In the project team, there are young engineers who are fresh graduated students. The achievement of the team in the project is to shorten the implementation time of 1 day compared to the plan, save great costs for the Company and ensure efficiency and safety in loading-out overweight oversize structure for the Northern branch.