Vietranstimex Cooperates With The Enterprise For Constructing, Surveying And Repairing Petroleum Exploitation Projects To Sucessfully Load-Out The Topside Of BK-21 Rig For White Tiger Field
09/03/2020 Vietranstimex Cooperates With The Enterprise For Constructing, Surveying And Repairing Petroleum Exploitation Projects To Sucessfully Load-Out The Topside Of BK-21 Rig For White Tiger Field

On September 1st, 2020, Vietranstimex coordinated with the Enterprise for Constructing, Surveying and Repairing Petroleum Exploitation Projects (Construction Enterprise) to successfully loaded-out the Topside of the BK-21 uninhabited wellhead rig for White Tiger field at the manufacturing site located in Vietsovpetro port, Vung Tau City. This is the second cooperation between Vietranstimex and the Construction Enterprise in transporting parts of BK-21 rig.

Vietranstimex Successfully Transported The 220kV – 240MVA Transformer And Associated Fittings To Krong Suong Substation In Cambodia
08/26/2020 Vietranstimex Successfully Transported The 220kV – 240MVA Transformer And Associated Fittings To Krong Suong Substation In Cambodia

On August 25th, 2020, Vietranstimex successfully transported the 220kV-240MVA Transformer (10500mm x 3800mm x 3950mm) of 186 tons and associated fuels and fittings of 124 tons (390.28CBM) from Ho Chi Minh City to Krong Suong Substation in Cambodia (50km away from Xa Mat Border Gate). The Project marks the cooperation between Vietranstimex and Electricité du Cambodge (EDC).

Vietranstimex Successful Transport Total Boiler Packages Of The Central Utility System Under The Southern Petrochemical Project
08/20/2020 Vietranstimex Successful Transport Total Boiler Packages Of The Central Utility System Under The Southern Petrochemical Project

On August 18th, 2020, Vietranstimex finished transporting all four boiler packages of the Central Utility System which is a part of the Long Son Petrochemical Project and assembly of these boilers into platforms on the site of Southern Petrolimex Complex In Long Son, Vung Tau.

Vietranstimex Officially Put Thanh Hung Inland Waterway Port Into Operation In Long Son, Ba Ria Vung Tau
08/13/2020 Vietranstimex Officially Put Thanh Hung Inland Waterway Port Into Operation In Long Son, Ba Ria Vung Tau

In early August, Vietranstimex was approved for operating in providing the services of transporting, loading/unloading, Logistics,… at Thanh Hung Inland Waterway Port located in Long Son commune, Long Son island, which is 13km away from Vung Tau city in the Southwest direction.

Vietranstimex Successfully Transported The 220Kv – 250MVA Transformer And Associated Fittings From 220Kv Than Uyen Substation To  220Kv Thuy Nguyen Substation
08/03/2020 Vietranstimex Successfully Transported The 220Kv – 250MVA Transformer And Associated Fittings From 220Kv Than Uyen Substation To 220Kv Thuy Nguyen Substation

On July 27th, 2020, Vietranstimex successfully received and transported the 220kV-250MVA Transformer (11830mm x 3230mm x 3620mm) of 140 tons and associated fuels and fittings of 95 tons  from 220kV Than Uyen Substation (Lai Chau) to 220kV Thuy Nguyen Substation (Hai Phong). The Project marks the cooperation between Vietranstimex and Power Transmission Company N01 (PTC1).

Vietranstimex Cooperates With Deugro To Receive And Transport Central Utility System – Package G In The Southern Petrochemical Project
07/31/2020 Vietranstimex Cooperates With Deugro To Receive And Transport Central Utility System – Package G In The Southern Petrochemical Project

On July 29th, 2020, Vietranstimex finished the phase 1 of transporting the first three Boiler packages of the Central Utility System which is a part of the Long Son Petrochemical Project. These 03 Boilers are now stored in the Vietranstimex’s storage yard in Long Son, Vung Tau. This process began from July 24th and the completion of whole transportation to the factory is expected on August 16th 2020.